What does the high level process look like?Once we have your desired configuration, we will arrange a visit to come and meet you and look at the suitability of the site. Once the site passes our preliminary checks, we will order a soil test to determine if our foundation system and weight of the Studio will be properly supported.
-
How long does it take to get one installed?Around 3 months including permits, manufacturing, site prep, foundation, transportation, and installation. A large variable we have no control over are planning permissions as they differ so much between councils and countries. As long as there are no material shortages or delays, manufacturing is the most predictable as it all happens within the area we control - our factory. For a typical base Studio we usually aim to have it complete within 1-2 months. A soil test will take 1-2 weeks, and installing the foundation is around 1 day. Transportation should take no longer than 1 day and installation of the Studio itself should be around 1 day as well.
bottom of page