Process
With you ever step of the way.
STEP 1
Discovery
-
A member of our team will contact you via phone or a video call to discuss any initial questions you may have around the Studio and the build & installation process.
-
We can arrange a visit to determine if there are any initial obstacles around site access and installation.
Schedule a call with a member of our team
STEP 2A
Configuration
-
Based on the size of the site and your needs, we can determine the right configuration for your Studio.
-
Beyond the space configuration you choose, you'll also be able to finalise flooring, facade, window frame colour, terrace decking, and optional packages like home automation.
STEP 2B
Permit
-
If a building permit is required we can send you Studio plans and elevations to help you in that process.
-
For certain markets we can also provide guidance on the permit process and can even do it for you along with providing site plans at an additional cost.
-
A soil study at this stage is recommended to determine the suitability of our foundation system. We can arrange this on your behalf.
STEP 3
Approval
-
A final build cost including foundation, transportation and installation will be sent over to you to review and approve.
-
Once approved, an initial 5% down payment is required to start the process.
-
A project plan is shared so you can keep track of progress and timings
-
Time to get excited!
STEP 4
Manufacturing
-
Depending on material availability and capacity, a build slot will be assigned for your Studio.
-
Manufacturing happens in stages and for a regular sized Studio it is typically around 3-4 months or sooner.
STEP 5
Preparation
-
Now that the manufacturing of your Studio is well under way, it's time to think about preparing your site.
-
If the site needs to be levelled, this would need to be arranged by you in advance of the foundation stage. We have access to a great network of landscapers and can provide you quotes for that work.
-
A contractor and qualified electrician will be required to dig a trench and run conduits for electricity and data from your primary home to the location of the Studio.
STEP 6
Foundation
-
Once the site is prepped, we will arrange to install the foundations a few weeks or days before the arrival of the Studio.
-
The installation time is typically less than a day.
STEP 7
Installation
-
Our transportation partners will deliver the Studio to the site.
-
If the road needs to be blocked off, our team will ensure the right permits are in place ahead of time to reduce any impact to you and your neighbours.
-
The installation team will ensure that the site is safe before we hoist the Studio to its new home and secure it.
-
A qualified electrician will connect the Studio to the connection points previously installed.
STEP 8
Ready!
-
Put your indoor slippers on - your Studio is now ready to be enjoyed!
-
During the next 30 days of use we would encourage you to note any snags that you would like us to fix.
-
Your Studio has been designed to be low maintenance and durable and includes a 10 year warranty.