Process

With you ever step of the way.

STEP 1

Discovery

trowel2.jpg
  • A member of our team will contact you via phone or a video call to discuss any initial questions you may have around the Studio and the build & installation process.

  • We can arrange a visit to determine if there are any initial obstacles around site access and installation.

Schedule a call with a member of our team

STEP 2A

Configuration

savanna-studio-web-personalise-blocks_edited_edited.png
  • Based on the size of the site and your needs, we can determine the right configuration for your Studio.

  • Beyond the space configuration you choose, you'll also be able to finalise flooring, facade, window frame colour, terrace decking, and optional packages like home automation.

STEP 2B

Permit

plans.jpeg
  • If a building permit is required we can send you Studio plans and elevations to help you in that process.

  • For certain markets we can also provide guidance on the permit process and can even do it for you along with providing site plans at an additional cost.

  • A soil study at this stage is recommended to determine the suitability of our foundation system. We can arrange this on your behalf.

STEP 3

Approval

pen.jpg
  • A final build cost including foundation, transportation and installation will be sent over to you to review and approve.

  • Once approved, an initial 5% down payment is required to start the process.

  • A project plan is shared so you can keep track of progress and timings

  • Time to get excited!

STEP 4

Manufacturing

hardhat.jpg
  • Depending on material availability and capacity, a build slot will be assigned for your Studio.

  • Manufacturing happens in stages and for a regular sized Studio it is typically around 3-4 months or sooner.

STEP 5

Preparation

wiring.jpg
  • Now that the manufacturing of your Studio is well under way, it's time to think about preparing your site.

  • If the site needs to be levelled, this would need to be arranged by you in advance of the foundation stage. We have access to a great network of landscapers and can provide you quotes for that work.

  • A contractor and qualified electrician will be required to dig a trench and run conduits for electricity and data from your primary home to the location of the Studio.

STEP 6

Foundation

groundscrew.webp
  • Once the site is prepped, we will arrange to install the foundations a few weeks or days before the arrival of the Studio.

  • The installation time is typically less than a day.

STEP 7

Installation

hook.jpg
  • Our transportation partners will deliver the Studio to the site.

  • If the road needs to be blocked off, our team will ensure the right permits are in place ahead of time to reduce any impact to you and your neighbours.

  • The installation team will ensure that the site is safe before we hoist the Studio to its new home and secure it.

  • A qualified electrician will connect the Studio to the connection points previously installed.

STEP 8

Ready!

slippers.webp
  • Put your indoor slippers on - your Studio is now ready to be enjoyed!

  • During the next 30 days of use we would encourage you to note any snags that you would like us to fix.

  • Your Studio has been designed to be low maintenance and durable and includes a 10 year warranty.

savanna-web-transport-night.jpg

Ready to explore?

Build your best space